Energy Storage PCS Knowledge Base

Utility-scale AC Solutions,
from the World No.5 PCS Supplier.

The knowledge base for Sineng BESS PCS and turnkey AC solutions, with certification status, market studies and project references.

Central PCS
5 models
String PCS
4 models
AC Solutions
15 variants
Overseas delivery
8.2 GW · 35 markets
Certification
UL · IEC
Products

Check our PCS products, in a logical way.

All products →
Models · 5 1250 – 2000 kW

Central PCS

High-power central conversion for utility-scale BESS blocks — five models from 1250 to 2000 kW.

Models · 4 200 – 430 kW

String PCS

Modular string conversion at 200 – 430 kW per unit, for distributed block architectures and granular MPPT of storage racks.

Models · 15 ≤ 13.8 MVA · 10–35 kV

AC Solutions

Turnkey PCS + MV skid solutions up to 13.8 MVA — central or string based, 10 – 35 kV grid connection.

Configuration

Compare models at a glance.

Certification status →
ModelCategoryRated powerMax DC voltageEfficiencyCooling
kWVdc% max
EH-1250-HB-UD Central PCS 1250 1500 V 99% Forced air
EH-1600-HB-UD Central PCS 1600
EH-1725-HB-UD Central PCS 1725 1500 V 99% Forced air
EH-1725-HA-UD Central PCS 1725 1500 V 99% Forced air
EH-2000-HA-UD Central PCS 2000 1500 V 99% Forced air
EH-0200-HA-M String PCS 200 1500 V 99% Forced air
EH-0215-HA-M String PCS 215 1500 V 99% Forced air
EH-0250-HA-M String PCS 250 1500 V 99% Liquid
EH-0430-HA-M String PCS 430 1500 V 99% Liquid
Rated clients only

Full configuration & options tables

Complete option matrices, derating curves and project pricing references are available to registered, rated partners.

Request access
Projects

Proven in the field.

All references →
Egypt's first utility-scale BESS connects to the 220 kV grid
Aswan, Egypt2025

Egypt's first utility-scale BESS connects to the 220 kV grid

Power
150 MW
Capacity
300 MWh
576 MW of central PCS for Khavda Energy Park
Gujarat, India2026

576 MW of central PCS for Khavda Energy Park

Power
576 MW
Site total
3,530 MWh
140.8 MW standalone BESS — first Sineng PCS shipment to the U.S.
South Texas, USA2024

140.8 MW standalone BESS — first Sineng PCS shipment to the U.S.

Power
140.8 MW
Capacity
140.8 MWh
Market

Know the rules before you bid.

Market library →

Question intake Have a question we haven't answered? Leave it here — it goes straight to the overseas sales team and feeds the product FAQ. High-priority questions get a reply within 24 hours.

Scoping a storage project?

Send your project basics — country, grid code, MW/MWh — and the overseas sales team replies within 24 hours. Or ask the AI assistant anything on this site, any time.